
Field Week Expedition
Site Condition Mooring Blocks Grapnel Anchor When archaeologists and conservators were out on site in September, they noticed the small grapnel anchor had come loose from the other concreted anchors and cannon it had been attached to since it was first observed in 1996. This unstable condition was confirmed on the first day of the October expedition and thus plans were made to recover it from the seafloor to avoid further impacts from strong storm The grapnel anchor is one of four anchors on the site and the smallest measuring 4’9” long and weighing approximately 80 pounds when cleaned. It originally had four or five prongs and was used as the ship's boat anchor. The other three anchors are ship’s anchors with lengths between 11 and 13 feet and tipping the scales at nearly a ton each. Recovery of the grapnel anchor was deemed a relatively light job and on Wednesday, the grapnel anchor was recovered with R/V Shell Point’s crane lift and the operation was a total success. The following day, the anchor was on display at the North Carolina Maritime Museum front patio from 9:30am-11:30 am. Several reporters from both newspaper and television stations filmed the event while curiosity seekers caught a glimpse of this freshly retrieved artifact. Many commented on its pungent smells and crusty look. The grapnel anchor was then wrapped up tightly again and transported to Greenville where it was again displayed from 1:00 to 3:00 pm to the delight of more media and public viewers. It will now undergo cleaning and conservation, a process that will take at least three years, before it is available for exhibit. When that does occur the grapnel anchor will make a very nice display piece – one that will invite the public to imagine life with the pirates, as they rowed about in their long boats.
In Situ Monitoring/Conservation On September 2nd aboard UAB’s 25-foot vessel R/V Snapdragon, project staff used a small 5 hp pump to run a 3-inch dredge with the hopes of digging out the sacrificial aluminum anode housed on a PVC frame. It was possible to dig out the test area on the crown of A3 to obtain a corrosion potential reading, but the sacrificial anode frame could not be relocated. Furthermore, the wire running from the anode to the anchor was found disconnected and thus the experiment was not operational. It became evident that a larger pump and dredge system was needed to relocate the anode and restart the experiment. This became the major focus of the October expedition. Prior to fieldwork, staff were preparing in the event that the original old aluminum anode was not found and a replacement was needed. To this end a combined effort produced great results. UAB Dive Safety Officer Julep Gillman-Bryan provided the project two aluminum dive tanks to use as sacrificial anodes and Captain Gerry Compeau of UNCW’s Center of Marine Sciences was kind With extra anodes available and given the success of the project over the first day and a half, archaeologists and conservators realized that there was an opportunity to expand the in situ monitoring project to other large artifacts beyond the current experiment at anchor A3. It was decided that a second anchor would provide the best comparative data. Anchor A1 was chosen because it is the highest artifact in the main ballast pile and is expected to remain accessible. Operations from R/V Shell Point continued to go off without a hitch. The same methodologies were followed for this field project as were used during the fall 2008 initiation of this project. A3 was the first order of business where a new test site was drilled into the anchor. A corrosion potential reading was obtained both from the original site and the new test site located on the upper arm which is in the water column. The new sacrificial aluminum anode was attached to the actual shank of A3 and the connection to the exposed metal in the drill hole was secured using a “G” clamp. A1 was the second large artifact to be monitored on site and its test site was also made on the upper arm where pH and corrosion potential readings were obtained and a sacrificial anode was attached in the same manner as A3 with the anode secured to its shank. Mild steel coupons were placed on the exposed and buried portions of both anchors to test the corrosion rates of what is taking place in the water column and in the anaerobic environments. Archaeologists only had time to uncover cannon C12 (QAR2100.000) for testing. It had been moved during the 2007 field season from its original position on site to the south end for storage. The test site on C12 was determined by where we could fit the “G” clamp around the gun and was ultimately placed on the right side of the cannon just behind the trunnions. The hole was drilled to solid metal, pH and corrosion potential readings were obtained, and then a sacrificial aluminum anode was connected to the solid metal of the cannon and secured to the top of the chase (forward portion of the cannon). C12 had to be excavated from under several feet of sand and will Conservators and archaeologists will continue to monitor and test the artifacts and coupons for corrosion potential data. This project will hopefully give us a larger understanding of what is currently happening to the artifacts that still remain on site. If the attachment of sacrificial anodes is successful, conservation time may be reduced once these large artifacts reach the lab. This in turn will reduce costs and expedite the time it takes for them to be stabilized and ready for public display. Data from this project will be formally presented at the ICOM-Metals October 2010 conference in Charleston, SC.
A Big Thank You … The success of the project was due in part to the experience and professionalism of the QAR project staff. A greater contribution came, however, from our partners without whom the project would not have been possible. Captain Tom Piner, his mate Mike Guthrie, and R/V Shell Point provided their expertise and the perfect work platform to accomplish all major tasks. The Office of the National Marine Sanctuary gave invaluable support and provided staff archaeologist Joe Hoyt for the duration of the project. US Coast Guard Station Fort Macon allowed us to use their basin, staging area, and cafeteria for breakfast. Fort Macon State Park provided staff housing and the NC Maritime Museum hosted the public viewing of the grapnel anchor.
|
Home | Archaeology | Artifacts | Conservation | Contact Us | Education | Environment | History | QAR Project